Building materials from China

Building materials from China, turnkey for your project

We supply villas, hotels, restaurants and developments directly from specialist factories. Our team converts the BOQ into precise specifications, approves samples, inspects each batch and delivers in phases aligned with construction.

Price my materials
up to 70%
savings in selected categories
1 BOQ
for a multi-factory tender
10%
flat turnkey fee
01

The entire BOQ, defined technically

The same product name does not mean the same building material. Porcelain varies by water absorption and calibre, SPC by wear-layer thickness, sanitaryware by cartridges and coating, and windows by profile and wind-load performance.

We divide the BOQ into categories, remove ambiguity and translate requirements into Chinese. Only comparable offers enter the tender, using the same units, waste allowance, packaging and certification requirements.

  • Tile, porcelain, mosaic and natural stone
  • Sanitaryware, taps, showers and glass
  • Doors, windows, flooring and wall finishes
  • Lighting, façade and decking materials
02

The sample becomes the batch standard

A render cannot communicate texture, shade or machining quality. Before order, we approve physical samples and technical data sheets. The model, colour, dimensions, tolerances, surface properties and packing become part of the specification.

During inspection, we check labels, shade and calibre, geometry, chips, mechanisms, completeness and quantity. Fragile products are selectively opened and any non-conformity is corrected before the container leaves China.

03

Delivery follows the construction programme

Not every material should arrive at once. We group concealed and rough-in items, finishes, sanitaryware and lighting, then final elements. This limits site storage and protects expensive surfaces from damage.

Orders from several factories are consolidated with weight and cargo compatibility in mind. Before shipping, we calculate volume, freight, duties, taxes and last mile — the complete cost delivered to the property.

How we source a complete material package

01

BOQ and drawings

We review quantities, waste, standards, climate and the construction programme.

02

Factory tender

We select specialists by category and compare identical specifications.

03

Samples

We approve colour, texture, data sheets and installation details.

04

Production

Lots, timing and control points are locked for every factory.

05

Inspection

We check quantity, properties, shade, calibre, completeness and packing.

06

Phased delivery

We consolidate and deliver each package for the correct construction stage.

Case in numbers

Estimate: furnishing a 4-bedroom villa

The same design project priced two ways: local showrooms — versus buying factory-direct in Foshan with door-to-door delivery.

Local marketVia Dream ViewSavings
Furniture (all rooms + terrace)$85,000$32,000−62%
Tile and stone, 240 m²$18,000$7,400−59%
Sanitaryware, 4 bathrooms$22,000$9,800−55%
Lighting and décor$12,000$4,600−62%
Curtains and textiles$9,000$4,100−54%
Total$146,000$57,900−60%

A consolidated estimate based on real 2025–2026 projects. Dream View prices are door-to-door: factory + freight + insurance + the flat 10% fee. An exact estimate for your project is calculated free of charge, before any contract.

Quality control

The AQL inspection checklist

Every batch goes through the same protocol — from the factory audit to the container seal. Defects are caught in China, not at your warehouse.

  1. 01

    Factory audit before ordering

    Business license, export history, a real manufacturer (not a trader), photo report from the site.

  2. 02

    Golden sample before the deposit

    An approved reference for materials, color and hardware — the basis for any later claim.

  3. 03

    In-production check (DUPRO)

    Inspection of raw materials and semi-finished goods on the line: materials, geometry, spec compliance.

  4. 04

    Final inspection (PSI) to ISO 2859

    Sampling at AQL 2.5 major / 4.0 minor / 0 critical before the balance is paid. The batch is accepted or reworked at the factory's cost.

  5. 05

    Photo and video before packing

    Every item is documented before packing; you sign off on the report.

  6. 06

    Loading check and container seal

    Piece count and packaging verified at loading, container sealed.

  7. 07

    Report for your approval

    The balance is paid to the factory only after you confirm the report.

  8. The outcome: defects stay in China

    An inspection costs a fraction of a percent of the batch. Skipping it costs rework, a delayed opening and a second freight run — at your expense.

    Request a batch inspection
Specification

What we supply: categories, clusters, standards

Each category is sourced in its home manufacturing cluster in China — where the specialist factories sit — and checked against category-specific standards.

Furniture & kitchens

Foshan (Lecong, Shunde)

E1/CARB P2, Martindale 50,000, PU foam 35–45 kg/m³, Blum/Hettich/DTC hardware

Sanitaryware

Foshan, Chaozhou

Ceramics and CW617N brass, ceramic cartridges, 2 mm tolerance

Tile & porcelain

Foshan

PEI IV–V, rectified edges, batch caliber and tone

Lighting & electrical

Zhongshan (Guzhen), Guangzhou

CE/RoHS, CRI ≥ 90, drivers, color temperature to spec

Textiles & curtains

Guangzhou, Shaoxing

Martindale, contract fire certificates for HORECA

Tableware & HORECA

Chaozhou, Guangzhou

Porcelain, 18/10 stainless steel, dishwasher durability

Doors, windows, finishes

Guangdong

Aluminium profiles, insulated glazing, moisture-resistant panels

Electronics & smart home

Shenzhen

CE/FCC, Zigbee/WiFi protocols, UN38.3 for batteries

Project sourcing and technical guides

Frequently asked questions

Which building materials are worth sourcing from China?+

Tile and porcelain, stone, sanitaryware, doors, windows, flooring, wall finishes, lighting, façade and decking materials. A complete property package creates the strongest economics.

Can you source from our design BOQ?+

Yes. We review the BOQ and drawings, clarify technical properties, units, waste allowances, shades, layouts and installation requirements, then tender specialist factories.

How do you control tile shade and calibre?+

We lock the model code, production lot, shade and calibre, verify carton markings and open samples. We reserve an allowance because a later production batch may not match exactly.

Which import documents are required?+

They depend on category and destination: conformity certificates, test reports, fire and sanitary documents. Before payment, we check the requirements, HS codes and documents tied to the actual manufacturer.

How are heavy and fragile materials shipped?+

Stone, glass and sanitaryware need plywood crates and correct securing; tile and flooring need weight and container-load control. We inspect packing before loading and insure the shipment.

Can deliveries follow the construction schedule?+

Yes. We phase concealed and rough-in items first, finishes next, then sanitaryware, lighting and final elements. This reduces site storage and damage risk.

Leave a request — and get a preliminary savings estimate within 24 hours.