Official contract
We fix the scope, prices, timelines and each side’s responsibility. You deal with a company, not a “private trader”.
Furniture, kitchens, sanitaryware, lighting, textiles and décor — to your design project, delivered in one shipment to your villa in Phuket, Bali or Dubai. 30–50% below local showrooms.
Furnishing a home through Southeast Asia's local showrooms means a 100–200% markup on furniture that was made in China anyway — and months of scattered deliveries: the sofa has arrived, the beds are pending, the lights are "next week". Dream View procures the entire FF&E scope factory-direct: each product group from its specialist manufacturer, at factory prices, with quality controlled on-site.
Everything is consolidated at our warehouse in China into one shipment and arrives at your property on the agreed date — customs-cleared, insured and documented.

You have bought or built a villa in Phuket, Bali or Dubai, and the most expensive part is still ahead — filling it. Local showrooms sell Chinese-made furniture at a 100–200% markup with "made to order" lead times of the same 2–3 months a factory-direct shipment takes. We close the entire scope under one contract: you approve the specification and walk into a finished home.
You run the project and answer to the client for the result. We become your studio's procurement department: we execute the specification in exact dimensions, materials and finishes, send samples before production, and document manufacturing in photo and video. Your design supervision — our hands in China. Our fee is transparent to your client.
Show units, turnkey resale villas, hotel room refurbishments. We have already outfitted 350 units of the Layan Green Park condo-hotel and furnish villas for Phuket development projects — we know how to budget per unit and hold the schedule when a property is handed over in phases.
Furnishing works like a constructor: take the full scope or individual groups. For every category we source a specialist factory — one that makes precisely kitchens, precisely taps or precisely outdoor furniture, not "everything at once".
Villas and hotel units in Phuket: every piece of furniture, sanitaryware, lighting and textile in these photos was bought factory-direct in China and delivered in one shipment.






An indicative FF&E budget structure for a three-bedroom villa bought factory-direct — around $70,000–100,000 in total depending on grade. The same items from showrooms would run $140,000–200,000.
Indicative example: the exact estimate is calculated from your specification before the contract is signed and fixed together with the landed cost.
An example: a full furniture and sanitaryware package that costs $100,000 in Phuket showrooms. Ordered through Dream View, the same set — from the same manufacturing factories — arrives at your property for roughly $58,000.
In the price: the same Chinese factory + importer + showroom rent + staff + retail margin.
$40k goods at factory prices + $8k freight & insurance + $6k duties + $4k flat 10% fee.
A showroom in Thailand or Bali buys the same furniture in Foshan and resells it at a 100–200% markup — covering rent, warehousing, staff and margin. We buy from the same factory at wholesale terms: you pay the manufacturer's price plus our transparent 10%.
When furniture, sanitaryware, lighting and textiles travel as one consolidated shipment, freight is spread across the entire scope. A container from China to Thailand costs less than the showroom's "free delivery" that was long ago priced into every item.
Every item gets the correct commodity code before shipment; duties are calculated upfront and included in the fixed landed cost. No "pay extra at the border" and no cargo stuck at customs.
Goods travel from the factory to our consolidation warehouse and on to your property. There is no importer, distributor or retailer in the chain — each of whom adds their percentage in the classic scheme.
We start from your design project, or build a specification from reference photos: items, dimensions, materials, budget. We help adapt European-catalogue items to factory-made equivalents of the same grade.
Each product group — furniture, sanitaryware, lighting, textiles — goes to a specialist factory at a factory-direct price. Material, fabric and finish samples are approved before production starts.
AQL inspections during production and before shipment, with photo and video reports for every product group. Defects never leave the factory.
Everything is consolidated at our warehouse in China into a single shipment, insured, cleared through customs and delivered to your villa. On request — assembly and placement by local partners.

Furniture, windows, tile and lighting for a private villa — from specification to a single delivery on-site.
Outfitting of 350 units: outdoor and indoor furniture, doors, sanitaryware, lighting and finishing materials. The same process as a private villa — multiplied to hotel scale.
In 3–4 days you see the furniture, sanitaryware and lighting for your villa in person, in the world's largest furniture cluster. We build the itinerary around your specification, guide you through factories and showrooms, translate the negotiations and lock in prices on the spot. With an order of $30,000+, the tour organisation fee is credited against our commission.
The same furniture and sanitaryware sold in Phuket, Bali and Dubai showrooms — factory-direct, without the retail markup. Even with freight and our fee, the total is significantly lower.
Instead of dozens of shops and suppliers — one contract, one delivery schedule and one party responsible for the result.
All items consolidated into one container: no months of receiving scattered boxes — the villa is furnished in a single pass.
You see the factory price of every item. The cost to your door — goods, freight, duties — is locked in before production starts.
Phuket, Samui, Bangkok, Pattaya. Our home market: an office in Phuket, well-worn sea routes of 30–45 days and local assembly partners.
Bali and Jakarta. Regular LCL and container shipments, customs clearance through vetted brokers familiar with Indonesian import requirements.
Dubai, Abu Dhabi, plus Kazakhstan and the CIS. Sea and multimodal routes with fixed lead times and landed cost.
The biggest furnishing mistake is starting after the finishing works are done. The optimal start is 4–5 months before planned move-in: the container then arrives exactly as the villa is ready, and the home never stands empty.
We approve items, materials and budget, and fix the landed cost. The best moment is when rough finishing works are underway on-site.
Factories build custom furniture in 30–60 days. In parallel we approve fabric and finish samples and run interim inspections.
Final inspection, consolidation into a container, insurance and a 30–45-day sea passage with customs clearance.
The container arrives as the villa reaches finish readiness: we bring everything in, assemble and place it — the home is move-in ready.
Every showroom delivers "when the batch arrives": the sofa in a month, the beds in three. Styles clash, deliveries stretch over half a year, and the combined markup doubles the cost of the home.
A Taobao photo shows neither real dimensions, nor appliance voltage, nor build quality. Without warehouse inspection, defects surface at the villa — when it is too late to return anything to anyone.
DIY calculations routinely miss import duties and the fact that furniture is billed by volume. The "cheap" purchase gets 30–40% more expensive right at the port.
Furnishing gets remembered when the finishing is done. The result: half a year in an empty house, or overpaying showrooms for "in stock". The right moment to start is rough finishing.

The same quality tier — 2–5 times cheaper.
Private projects in Thailand, Indonesia, Europe and the UAE.
“I paid — and the goods never came” is the main fear of sourcing from China. Here is how we close it at every stage.
We’ll show you the contract and payment schedule on a free consultation.
Get a consultationIt depends on the size and finish level: the FF&E budget for a 300–500 m² villa is typically $50,000–150,000. We take on projects from $30,000. Thanks to factory-direct pricing, savings versus buying from showrooms in Thailand, Bali or the UAE run 30–50% — even after freight, duties and our flat 10% fee.
Everything that fills a home: furniture to spec and custom-made, kitchens, sanitaryware, lighting, doors, textiles, tableware, appliances, décor and outdoor furniture. We source a specialist factory for each group, control quality on-site, consolidate everything into one shipment and deliver to your property.
Both work. If you have a design project, we procure strictly to specification and help adapt items for production. If you do not, we build a specification from reference photos and your budget, and source equivalents at the right level. We work directly with designers and architects as their procurement partner.
Roughly 60–120 days from specification sign-off: custom furniture production takes 30–60 days, sea freight another 30–45 days. Timelines are fixed in the contract. The best approach is to plan furnishing in parallel with finishing works, so the furniture arrives as the property is ready.
We deliver to your property in Thailand (Phuket, Bangkok, Samui), Indonesia (Bali), the UAE, Kazakhstan and other countries. We handle export clearance, insurance, import customs with correct commodity codes and delivery to the villa. On request, we arrange assembly and placement through local partners.
The first line of defence is that defects should never leave the factory: we run AQL inspections during production and before shipment, and every batch is insured in transit. If damage does occur en route, it is an insured event — under the contract we arrange replacement or compensation. You are never left alone against the carrier and the factory.
Yes. Furnishing works like a constructor: take only furniture, only sanitaryware and lighting, or any combination of groups — the threshold is the same, from $30,000 per project. Many clients start with one group and order the rest after seeing the quality and economics of the first delivery.
Yes, two ways. Remotely: material samples, live photos and video walkthroughs from factories and showrooms. Or in person: we organise a furniture tour to Foshan — in 3–4 days you handpick everything for your villa in the world's largest furniture cluster, while we guide, translate and lock in factory prices.