Dream ViewDream View
Equipment from China

Equipment from China, factory-direct and turnkey

We find the manufacturer for your technical brief, compare like-for-like configurations, verify the plant, accept the machine before dispatch and manage customs-cleared delivery to your site.

Source my equipment
3–5 factories
in the final technical comparison
5–10 days
to the initial shortlist
10%
flat turnkey fee
01

A technical tender, not a price-list comparison

Two machines that look identical can use different motors, controls, tolerances, component grades and real throughput. Sourcing therefore starts with the operating requirement and a measurable technical specification, not the lowest advertised price.

We normalize offers to one configuration: voltage and frequency, throughput, permitted inputs, automation, tooling, software, labelling and safety. Only then do we compare price and lead time.

  • Industrial machinery and production lines
  • Packaging and warehouse equipment
  • Food-processing, refrigeration and HORECA equipment
  • Tooling, spare parts and components
02

Verify both the plant and the machine

A sales deck does not prove the supplier manufactures the equipment or can support it a year later. We check the Chinese legal entity, plant address, product focus, capacity, engineering team and export documents.

The contract defines a factory acceptance test: what the machine must demonstrate, using which input, at what throughput and reject rate. The inspector checks nameplates, scope of supply, electricals, guards and packing before the balance payment.

03

Logistics is engineered with the equipment

If a module exceeds a standard container, the project may require open top, flat rack or oversized routing. Before manufacturing, we confirm disassembly, lifting points, centre of gravity, preservation and export packing.

We establish the HS code, duties, taxes, certificates and document set before shipment. Manuals, drawings, start-up consumables and critical spare parts travel with the order so commissioning does not wait for one inexpensive component.

How equipment sourcing works

01

Technical brief

We define the task, throughput, operating conditions, standards, budget and start date.

02

Factory search

We identify specialist manufacturers and verify their legal and technical base.

03

Comparison

Factories quote one configuration and we estimate the landed cost.

04

Contract

We lock the specification, FAT, warranty, spares, documents and payment stages.

05

Acceptance

We run the test and check completeness, safety, labelling and packing.

06

Delivery

We manage export, insurance, customs and transport to the installation site.

Case in numbers

Estimate: a mixed 40HQ container for a store

One container (~76 m³) of retail stock priced two ways: local wholesalers — versus factory consolidation via Dream View.

Local marketVia Dream ViewSavings
Furniture and interior goods$44,000$26,500−40%
Lighting and electrical$21,000$12,800−39%
Tableware and homeware$18,000$11,200−38%
Textiles$13,000$10,500−19%
Total$96,000$61,000−36%

A consolidated estimate based on real 2025–2026 projects. Dream View prices are door-to-door: factory + freight + insurance + the flat 10% fee. An exact estimate for your project is calculated free of charge, before any contract.

Quality control

The AQL inspection checklist

Every batch goes through the same protocol — from the factory audit to the container seal. Defects are caught in China, not at your warehouse.

  1. 01

    Factory audit before ordering

    Business license, export history, a real manufacturer (not a trader), photo report from the site.

  2. 02

    Golden sample before the deposit

    An approved reference for materials, color and hardware — the basis for any later claim.

  3. 03

    In-production check (DUPRO)

    Inspection of raw materials and semi-finished goods on the line: materials, geometry, spec compliance.

  4. 04

    Final inspection (PSI) to ISO 2859

    Sampling at AQL 2.5 major / 4.0 minor / 0 critical before the balance is paid. The batch is accepted or reworked at the factory's cost.

  5. 05

    Photo and video before packing

    Every item is documented before packing; you sign off on the report.

  6. 06

    Loading check and container seal

    Piece count and packaging verified at loading, container sealed.

  7. 07

    Report for your approval

    The balance is paid to the factory only after you confirm the report.

  8. The outcome: defects stay in China

    An inspection costs a fraction of a percent of the batch. Skipping it costs rework, a delayed opening and a second freight run — at your expense.

    Request a batch inspection
Specification

What we supply: categories, clusters, standards

We buy machinery from manufacturers and their export companies in China's specialist clusters and accept every unit against a checklist before shipment — hours, serial numbers and the documents your market needs.

Excavators & loaders

Xuzhou, Changsha, Liuzhou, Linyi

Weight and bucket class, engine and emission stage for your country (Stage V / China IV / Tier 3), hours, PDI checklist

Trucks & tractor units

Jinan, Xi'an, Changchun, Shiyan

6×4 / 8×4 axle configuration, emission class for the market, LHD or RHD, registration documents

Cranes & concrete pumps

Changsha, Xuzhou

Load chart, load moment limiter, independent crane inspection before shipment

Crushing & batching plants

Zhengzhou, Shanghai

Capacity in t/h and m³/h, foundation drawings, supervised installation, spare-parts list

Block & brick lines

Quanzhou, Linyi

Output per shift, moulds per block size, vibration table, operator training

Machine tools & production lines

Jinan, Ningbo, Dongguan

CE, factory acceptance test (FAT), accuracy per datasheet, software language

Spare parts kits

Manufacturer

Spare-parts list in the contract, parts lead times, catalogue by serial number

Documents & acceptance

Exporter and plant

Company check (USCC), PDI / FAT, certificate of origin, document pack for your market

Control the purchase and delivery

Frequently asked questions

What equipment can you source from China?+

Industrial lines, machinery, packaging, food-processing, refrigeration, warehouse and HORECA equipment, plus parts and tooling. We first check import restrictions and destination-market certification.

How do you verify a Chinese equipment manufacturer?+

We check the legal entity, manufacturing profile, actual capacity, export history and documentation. For a material order, we audit the plant and perform technical acceptance with a test run.

Can equipment be built to our technical specification?+

Yes. We translate the brief into Chinese and agree throughput, power, interfaces, materials, accuracy, safety, scope of supply and the factory acceptance test protocol.

What is included in turnkey supply?+

Factory search and tender, negotiation, contract and payments, production control, inspection, export packing, insurance, customs clearance and delivery. Commissioning is scoped per project.

How are warranty and spare parts handled?+

Before order, we lock the warranty period, critical spares list, remote diagnostics, documentation language and supplier response times. A start-up spares kit can ship with the machine.

How is oversized machinery shipped?+

By standard or open-top container, flat rack or project cargo. Before production, we validate transport dimensions, lifting points, securing and the final route to site.

Leave a request — and get a preliminary savings estimate within 24 hours.

By clicking the button you consent to the processing of personal data.

Get an estimate