Dream ViewDream View
All articles
Logistics

Shipping from China to Europe: sea, rail, road and EU customs

How to ship goods from China to Europe: by sea, rail, road or air, timelines and cost, EU customs, duties and VAT, the EORI number and CE marking. A breakdown for importers.

Dream ViewJune 24, 20263 min read
Shipping from China to Europe: routes, timelines, customs — Dream View

Europe is a mature destination for sourcing from China with several established routes, but also stricter requirements: EU customs, CE marking and importer registration. Let us break down how to ship goods from China to Europe.

Routes and methods

Method Time* When to choose
Sea (container) 30–45 days Large batches, project outfitting
Rail (China — Europe) 18–25 days Price/speed balance on large batches
Road 15–25 days Mid-size batches, address flexibility
Air 5–9 days Urgent and compact items

*Indicative time from cargo readiness to the door; depends on the route, season and customs.

The main volume goes by sea to major ports (Rotterdam, Hamburg, Antwerp) with onward distribution across the EU. The China — Europe rail corridor is a convenient compromise on time and price for large batches.

What the cost is made of

  1. Main-leg transport from China to the EU.
  2. Local costs in China — pickup, consolidation, export clearance.
  3. Customs charges in the EU — duty and VAT (see below).
  4. Door delivery in the destination country.
  5. Insurance — mandatory for high-value batches.

EU customs: what matters

When importing into the EU, account for:

  • Duty — the rate depends on the product category (TARIC code). The EU’s single customs tariff.
  • VAT — charged on import at the destination country’s rate (differs across EU countries).
  • EORI number — a registration number for traders in the EU, required for import customs clearance.
  • CE marking — for many categories (electrical equipment, a range of goods) it is mandatory for import and sale in the EU. Conformity is confirmed by documents from the manufacturer.
  • Documents — a correct TARIC code and a complete set (invoice, packing list, bill of lading/CMR).

In the EU, not only logistics is critical but compliance: without correct CE marking and the right documents, goods may fail customs or be barred from sale.

What affects timelines

  • Seasonality — before Chinese New Year, timelines and prices grow.
  • Documents and compliance — the absence of CE/required certificates delays or blocks import.
  • Route — sea is cheaper, rail is faster on large batches.
  • Consolidation — gathering cargo from several factories adds time at the start.

How it works turnkey

When sourcing through a partner, logistics and customs are part of the service: route choice (sea/rail/road), consolidation, correct documents and TARIC codes, checking marking requirements and door delivery in the EU. You see the final door-to-door price upfront.


Bringing goods from China to Europe? We will calculate the route, timeline and final cost including EU customs, VAT and marking requirements. For free.

Frequently asked questions

How long does shipping from China to Europe take?

Roughly: sea — 30–45 days, rail (China — Europe) — 18–25 days, road — 15–25 days, air — 5–9 days. Times from cargo readiness to the door depend on the route, season and customs.

What are the EU customs requirements for imports from China?

Duty by TARIC code, VAT at the destination country's rate, an EORI number for import clearance and CE marking for many categories. Without correct marking and documents, goods may fail customs.

What is CE marking and why is it needed?

CE confirms a product meets EU requirements. For many categories (electrical equipment and a range of goods) it is mandatory for import and sale in the EU. Conformity is confirmed by documents from the manufacturer.

Which is better — sea or rail to Europe?

Sea is cheaper for large batches and project outfitting. The China — Europe rail corridor is a convenient compromise on time and price for large batches when you need it faster than sea without paying for air.

Get an estimate